Active SectorUpdated 12h ago

PO19 5BZ

Chichester • Residential Catchment

Sales (24M)
4
Median Price4Y
£380,000
PO19 3 year price trend
-28.6%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of PO19 5BZ, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

84.9 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of PO19 5BZ is Solar at 80.0 MW (94.2% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 84.9 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near PO19 5BZ, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Lavant Pumping Station, Lavant Down Road - Solar Panels
Chichester · West Sussex · South East · England
Solar
Operational
9.30 MW
0.81 mi
Former Westhampnett Landfill
Chichester · West Sussex · South East · England
Solar
Operational
7.50 MW
1.58 mi
Strettington Solar Farm
Chichester · West Sussex · South East · England
Solar
Operational
5.00 MW
2.00 mi
Land at Tangmere Airfield
Chichester · West Sussex · South East · England
Solar
Operational
5.00 MW
3.29 mi
Merston
South East · England
Solar
Operational
5.00 MW
3.33 mi
Oving Solar Farm
Chichester · West Sussex · South East · England
Solar
Operational
5.00 MW
3.37 mi
Decoy
South East · England
Solar
Operational
5.34 MW
4.14 mi
Lagness
South East · England
Solar
Operational
4.85 MW
4.58 mi
Lidsey Landfill
Arun · West Sussex · South East · England
Gas
Operational
1.40 MW
4.78 mi
Manor Farm - Shripney
Arun · West Sussex · South East · England
Solar
Operational
5.00 MW
5.02 mi
Bilsham Farm
Arun · West Sussex · South East · England
Solar
Operational
14.5 MW
6.81 mi
Ferry Farm
South East · England
Solar
Operational
4.92 MW
6.91 mi
Binsted
South East · England
Solar
Operational
5.00 MW
7.36 mi
Southleigh Landfill
Havant · Hampshire · South East · England
Gas
Operational
3.50 MW
7.75 mi
Brookbarn
South East · England
Solar
Operational
3.63 MW
9.09 mi