Active SectorUpdated 12h ago

PO8 0PL

Horndean, Clanfield • Residential Catchment

Sales (24M)
4
Median Price4Y
£179,000
PO8 3 year price trend
+8.5%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of PO8 0PL, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

84.4 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of PO8 0PL is Solar at 64.5 MW (76.4% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 84.4 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near PO8 0PL, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Lovedean
South East · England
Solar
Operational
4.54 MW
2.32 mi
Southleigh Landfill
Havant · Hampshire · South East · England
Gas
Operational
3.50 MW
5.08 mi
Southwick Estate
Winchester · Hampshire · South East · England
Solar
Operational
48.0 MW
5.13 mi
Paulsgrove Landfill Site
Portsmouth · Hampshire · South East · England
Gas
Operational
2.40 MW
8.05 mi
Portsmouth ERF
Portsmouth · Hampshire · South East · England
Waste / EfW
Operational
14.0 MW
8.27 mi
Glebe Farm, Curdridge Lane - Solar Farm
Winchester · Hampshire · South East · England
Solar
Operational
12.0 MW
9.23 mi