Sales (24M)
3Active SectorUpdated 12h ago
PR4 0UD
Inskip, Inskip-With-Sowerby • Residential Catchment
Median Price8Y
£205,000PR4 3 year price trend
-5.9%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of PR4 0UD, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
78.1 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of PR4 0UD is Solar at 57.5 MW (73.6% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 78.1 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near PR4 0UD, ordered by straight-line distance from the mapped centre.