Sales (24M)
8Active SectorUpdated 12h ago
SO22 4JF
Winchester, Badger Farm • Residential Catchment
Median Price2Y
£293,500SO22 3 year price trend
-14.3%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of SO22 4JF, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
145 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of SO22 4JF is Solar at 142 MW (98.3% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 145 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near SO22 4JF, ordered by straight-line distance from the mapped centre.