Active SectorUpdated 12h ago

SO22 6FT

Winchester, Headbourne Worthy • Residential Catchment

Sales (24M)
3
Median Price5Y
£290,000
SO22 3 year price trend
-14.3%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of SO22 6FT, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

174 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of SO22 6FT is Solar at 172 MW (99.1% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 174 MW, versus 105 GW nationally (0.2%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near SO22 6FT, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Three Maids Hill Solar Farm
Winchester · Hampshire · South East · England
Solar
Operational
25.0 MW
2.15 mi
Field House Solar / Hursley Road
Winchester · Hampshire · South East · England
Solar
Operational
6.40 MW
5.97 mi
Owls Lodge
South East · England
Solar
Operational
10.0 MW
7.15 mi
Bishops Sutton
South East · England
Solar
Operational
12.0 MW
7.64 mi
Fairoak Landfill
Eastleigh · Hampshire · South East · England
Gas
Operational
1.50 MW
8.64 mi
Fullerton
South East · England
Solar
Operational
4.36 MW
8.69 mi
Warren
South East · England
Solar
Operational
4.99 MW
8.77 mi
Eveley
South East · England
Solar
Operational
49.3 MW
8.97 mi
Chalcroft Solar Park
Eastleigh · Hampshire · South East · England
Solar
Operational
6.30 MW
9.41 mi
Westover
South East · England
Solar
Operational
7.04 MW
9.42 mi
Cowdown Lane
Test Valley · Hampshire · South East · England
Solar
Operational
40.0 MW
9.60 mi
Abbots Ann
Test Valley · Hampshire · South East · England
Solar
Operational
7.00 MW
9.69 mi