Active SectorUpdated 12h ago

SO32 1HB

Upham • Residential Catchment

Sales (24M)
3
Median Price8Y
£695,000
SO32 3 year price trend
-0.4%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of SO32 1HB, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

273 MW

Filtered total

Storage capacity

40.0 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of SO32 1HB is Solar at 193 MW (61.6% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 313 MW, versus 105 GW nationally (0.3%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near SO32 1HB, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Fairoak Landfill
Eastleigh · Hampshire · South East · England
Gas
Operational
1.50 MW
1.18 mi
Chalcroft Solar Park
Eastleigh · Hampshire · South East · England
Solar
Operational
6.30 MW
2.60 mi
Glebe Farm, Curdridge Lane - Solar Farm
Winchester · Hampshire · South East · England
Solar
Operational
12.0 MW
2.71 mi
Raglington Farm Solar Park
South East · England
Solar
Operational
5.73 MW
3.67 mi
Netley Landfill Solar
Eastleigh · Hampshire · South East · England
Solar
Operational
12.0 MW
6.34 mi
Field House Solar / Hursley Road
Winchester · Hampshire · South East · England
Solar
Operational
6.40 MW
6.48 mi
Netley Landfill Site, Hampshire (Extension)
Eastleigh · Hampshire · South East · England
Gas
Operational
1.20 MW
6.51 mi
Netley
South East · England
Solar
Operational
5.00 MW
7.17 mi
Warren
South East · England
Solar
Operational
4.99 MW
9.02 mi
Bishops Sutton
South East · England
Solar
Operational
12.0 MW
9.11 mi
Southwick Estate
Winchester · Hampshire · South East · England
Solar
Operational
48.0 MW
9.61 mi
Grove Solar Park (Phase 2)
Test Valley · Hampshire · South East · England
Solar
Operational
11.0 MW
9.68 mi
Tanners Lane - Battery Energy Storage Facility (Phase One)
Solihull · West Midlands · West Midlands · England
Battery
Operational
40.0 MW
9.80 mi
Fareham
South East · England
Solar
Operational
20.5 MW
9.85 mi
Hythe
South East · England
Gas
Operational
53.0 MW
9.86 mi
Newlands Farm Solar
Fareham · Hampshire · South East · England
Solar
Operational
49.0 MW
9.86 mi
Fawley Waste to Energy Plant
New Forest · Hampshire · South East · England
Waste / EfW
Operational
8.60 MW
9.88 mi
Marchwood ERF
New Forest · Hampshire · South East · England
Waste / EfW
Operational
16.0 MW
9.93 mi