Sales (24M)
1Active SectorUpdated 12h ago
SP4 6LD
Gomeldon, Idmiston • Residential Catchment
Median Price4Y
£605,000SP4 3 year price trend
+32.8%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of SP4 6LD, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
103 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of SP4 6LD is Solar at 102 MW (98.9% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 103 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near SP4 6LD, ordered by straight-line distance from the mapped centre.