Sales (24M)
15Active SectorUpdated 12h ago
SR8 3SA
Easington (county Durham), Easington Colliery • Residential Catchment
Median Price
£28,000SR8 3 year price trend
+72.3%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of SR8 3SA, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
1.3 GW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of SR8 3SA is Nuclear at 1.2 GW (91.6% of capacity), compared with 5.6% nationally. Total mapped capacity within 10 miles is 1.3 GW, versus 105 GW nationally (1.2%).
Nearby power sites
Power sites near SR8 3SA, ordered by straight-line distance from the mapped centre.