Active SectorUpdated 12h ago

ST13 5QP

Leek • Residential Catchment

Sales (24M)
5
Median Price2Y
£99,000
ST13 3 year price trend
+19.9%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of ST13 5QP, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

32.5 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of ST13 5QP is Solar at 18.3 MW (56.4% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 32.5 MW, versus 105 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near ST13 5QP, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Heywood Grange
West Midlands · England
Solar
Operational
4.96 MW
6.38 mi
Moneystone
West Midlands · England
Solar
Operational
4.98 MW
7.11 mi
Land at Heywood Grange
Staffordshire Moorlands · Staffordshire · West Midlands · England
Solar
Operational
8.40 MW
7.12 mi
Stoke-on-Trent EfW
Stoke-on-Trent · Staffordshire · West Midlands · England
Waste / EfW
Operational
14.2 MW
9.90 mi