Sales (24M)
6Active SectorUpdated 12h ago
TA7 8BU
Puriton • Residential Catchment
Median Price2Y
£322,500TA7 3 year price trend
+14.1%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of TA7 8BU, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
118 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of TA7 8BU is Solar at 116 MW (98.6% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 118 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near TA7 8BU, ordered by straight-line distance from the mapped centre.