Sales (24m)
0Active SectorUpdated 12h ago
TR16 5TE
Lanner • Residential Catchment
Median Price (3Y)
£239,950TR16 Price Trend (5Y)
+2.6%/yrSales (24m)
0
Median Price (3Y)
£239,950
TR16 Price Trend (5Y)
+2.6%/yr
Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of TR16 5TE, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
128 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of TR16 5TE is Solar at 107 MW (83.4% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 128 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near TR16 5TE, ordered by straight-line distance from the mapped centre.