Active SectorUpdated 12h ago

TS12 2DG

Skelton (redcar and Cleveland), Skelton and Brotton • Residential Catchment

Sales (24M)
3
Median Price3Y
£101,250
TS12 3 year price trend
+26.3%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of TS12 2DG, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

476 MW

Filtered total

Storage capacity

6.00 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of TS12 2DG is Gas at 171 MW (35.4% of capacity), compared with 30.1% nationally. Total mapped capacity within 10 miles is 482 MW, versus 105 GW nationally (0.5%).

Nearby power sites

Power sites near TS12 2DG, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Guisborough
North East · England
Solar
Operational
5.00 MW
3.58 mi
Woodhouse PV
North East · England
Solar
Operational
4.88 MW
3.91 mi
Wilton 11 EfW
Redcar and Cleveland · Cleveland · North East · England
Waste / EfW
Operational
49.0 MW
4.63 mi
Wilton Centre (Waste AD)
Redcar and Cleveland · Cleveland · North East · England
Biomass
Operational
35.2 MW
4.63 mi
Wilton International
North East · England
Gas
Operational
120 MW
4.70 mi
Wilton 11
North East · England
Other
Operational
49.0 MW
4.94 mi
Wilton 10 Biomass
North East · England
Biomass
Operational
33.3 MW
5.94 mi
Cleveland Potash
Redcar and Cleveland · North Yorkshire · North East · England
Battery
Operational
6.00 MW
6.49 mi
ICI No2 (Teesport) Landfill
Redcar and Cleveland · Cleveland · North East · England
Gas
Operational
1.00 MW
7.42 mi
Teeside Offshore Wind Farm
DECC (S36) · Offshore · Offshore · England
Wind
Operational
62.0 MW
7.75 mi
Teesside
North East · England
Wind
Operational
62.0 MW
7.75 mi
Imperial Park
Redcar and Cleveland · Cleveland · North East · England
Biomass
Operational
5.10 MW
8.30 mi
Viking
North East · England
Gas
Operational
50.0 MW
8.66 mi