Active SectorUpdated 12h ago

TS20 1JN

Stockton-On-Tees • Residential Catchment

Sales (24M)
7
Median Price2Y
£136,180
TS20 3 year price trend
-28.6%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of TS20 1JN, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

1.8 GW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of TS20 1JN is Nuclear at 1.2 GW (65.1% of capacity), compared with 5.6% nationally. Total mapped capacity within 10 miles is 1.8 GW, versus 105 GW nationally (1.7%).

Nearby power sites

Power sites near TS20 1JN, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Billingham Chemical Works
Stockton-on-Tees · County Durham · North East · England
Waste / EfW
Operational
12.0 MW
1.31 mi
Haverton Hill Incinerator
Stockton-on-Tees · County Durham · North East · England
Waste / EfW
Operational
20.1 MW
1.88 mi
North East Energy Recovery Centre (adjacent to Teesside EfW)
Stockton-on-Tees · County Durham · North East · England
Waste / EfW
Operational
21.0 MW
1.98 mi
Blue House
North East · England
Solar
Operational
4.98 MW
3.19 mi
Lambs Hill Wind Farm
North East · England
Wind
Operational
8.00 MW
3.22 mi
Land at Bluehouse Farm
Hartlepool · Cleveland · North East · England
Solar
Operational
5.00 MW
3.24 mi
High Meadow
North East · England
Solar
Operational
3.89 MW
3.38 mi
Low Burntoft
North East · England
Solar
Operational
5.00 MW
3.69 mi
Red Gap
North East · England
Wind
Operational
12.5 MW
3.86 mi
Eaglescliffe Solar Farm
Stockton-on-Tees · County Durham · North East · England
Solar
Operational
5.00 MW
3.99 mi
Imperial Park
Redcar and Cleveland · Cleveland · North East · England
Biomass
Operational
5.10 MW
4.92 mi
Viking
North East · England
Gas
Operational
50.0 MW
5.37 mi
Dean Group Business Park - Hartlepool
Hartlepool · Cleveland · North East · England
Biomass
Operational
5.10 MW
5.61 mi
ICI No2 (Teesport) Landfill
Redcar and Cleveland · Cleveland · North East · England
Gas
Operational
1.00 MW
6.02 mi
Walkway
County Durham · County Durham · North East · England
Wind
Operational
14.0 MW
6.15 mi
Butterwick Moor Circuit 1
North East · England
Wind
Operational
9.40 MW
6.15 mi
Butterwick Moor Circuit 2
North East · England
Wind
Operational
9.40 MW
6.15 mi
Seamer
North East · England
Wind
Operational
10.3 MW
7.00 mi
Hartlepool
North East · England
Nuclear
Operational
1.2 GW
7.05 mi
High Volts RO
North East · England
Wind
Operational
5.50 MW
7.06 mi
Wilton 10 Biomass
North East · England
Biomass
Operational
33.3 MW
7.29 mi
Moor House Wind Farm
North East · England
Wind
Operational
12.0 MW
7.71 mi
Wilton 11
North East · England
Other
Operational
49.0 MW
8.31 mi
Wilton 11 EfW
Redcar and Cleveland · Cleveland · North East · England
Waste / EfW
Operational
49.0 MW
8.58 mi
Wilton Centre (Waste AD)
Redcar and Cleveland · Cleveland · North East · England
Biomass
Operational
35.2 MW
8.58 mi
Wilton International
North East · England
Gas
Operational
120 MW
8.79 mi
Hunger Hill
North East · England
Solar
Operational
5.00 MW
9.23 mi
Teeside Offshore Wind Farm
DECC (S36) · Offshore · Offshore · England
Wind
Operational
62.0 MW
9.24 mi
Teesside
North East · England
Wind
Operational
62.0 MW
9.24 mi