Active SectorUpdated 12h ago

YO26 7AB

Tockwith • Residential Catchment

Sales (24M)
5
Median Price
£288,490
YO26 3 year price trend
+12.2%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of YO26 7AB, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

29.4 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of YO26 7AB is Waste / EfW at 27.0 MW (91.8% of capacity), compared with 1.3% nationally. Total mapped capacity within 10 miles is 29.4 MW, versus 105 GW nationally (0.0%).

Nearby power sites

Power sites near YO26 7AB, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Harewood Whin Landfill Site
York · North Yorkshire · Yorkshire and Humber · England
Gas
Operational
2.40 MW
4.88 mi
Allerton Waste Recovery Park (EfW)
North Yorkshire · North Yorkshire · Yorkshire and Humber · England
Waste / EfW
Operational
27.0 MW
5.80 mi