Capacity
5.00 MW
Mapped total
Havering · London · London · England
Capacity
5.00 MW
Mapped total
Status
Inactive
Current state
Energy source
Biomass
Mapped fuel group
Frog Island AD Plant (Waste AD) is an inactive biomass site in Havering · London · London · England with 5.00 MW of mapped capacity operated by Shanks Group.