Capacity
2.50 MW
Mapped total
East Suffolk · Suffolk · Eastern · England
Capacity
2.50 MW
Mapped total
Status
Pipeline
Current state
Energy source
Waste / EfW
Mapped fuel group
V C Cooke, Ellough Road - Energy Recovery Facility is an pipeline waste / efw site in East Suffolk · Suffolk · Eastern · England with 2.50 MW of mapped capacity operated by VC Cooke & Son Limited.