Town Ledger18 postcode units

Four Ashes

South Staffordshire

Sales (24m)
3
Median Price (3Y)
£330,000
Price Trend (5Y)
+0.3%/yr

Sales (24m)

3

Median Price (3Y)

£330,000

Price Trend (5Y)

+0.3%/yr

Sites and CapacityA map view of the GB National Grid infrastructure.

This page presents the generation and storage capacities of the national grid in Great Britain. All generation figures represent theoretical maximum outputs. You can filter by energy source, view newly constructed facilities, facilities currently under construction, and those in the pipeline, such as projects in planning or development.

Generating capacity

23.0 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology across Four Ashes is Waste / EfW at 23.0 MW (100.0% of capacity), compared with 1.3% nationally. Total mapped capacity across Four Ashes is 23.0 MW, versus 105 GW nationally (0.0%).

Mapped power sites

Major mapped power sites across Four Ashes, ordered by operational status and installed capacity.

SiteTechnologyStatusCapacity
Four Ashes EfW
South Staffordshire · Staffordshire · West Midlands · England
Waste / EfW
Operational
23.0 MW