Town Ledger1,106 postcode units

Jarrow

South Tyneside

Sales (24m)
517
Median Price (3Y)
£150,000
Price Trend (5Y)
+3.4%/yr

Sales (24m)

517

Median Price (3Y)

£150,000

Price Trend (5Y)

+3.4%/yr

Sites and CapacityA map view of the GB National Grid infrastructure.

This page presents the generation and storage capacities of the national grid in Great Britain. All generation figures represent theoretical maximum outputs. You can filter by energy source, view newly constructed facilities, facilities currently under construction, and those in the pipeline, such as projects in planning or development.

Generating capacity

-

Filtered total

Storage capacity

35.0 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology across Jarrow is Battery at 35.0 MW (100.0% of capacity), compared with 3.9% nationally. Total mapped capacity across Jarrow is 35.0 MW, versus 105 GW nationally (0.0%).

Mapped power sites

Major mapped power sites across Jarrow, ordered by operational status and installed capacity.

SiteTechnologyStatusCapacity
Port Of Tyne, Tyne Dock - Battery Storage
South Tyneside · Tyne and Wear · North East · England
Battery
Operational
35.0 MW