Wallend
Medway
Sales (24m)
Median Price (3Y)
Price Trend (5Y)
Sites and CapacityA map view of the GB National Grid infrastructure.
This page presents the generation and storage capacities of the national grid in Great Britain. All generation figures represent theoretical maximum outputs. You can filter by energy source, view newly constructed facilities, facilities currently under construction, and those in the pipeline, such as projects in planning or development.
Generating capacity
755 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology across Wallend is Gas at 755 MW (100.0% of capacity), compared with 30.1% nationally. Total mapped capacity across Wallend is 755 MW, versus 105 GW nationally (0.7%).
Mapped power sites
Major mapped power sites across Wallend, ordered by operational status and installed capacity.