Active SectorUpdated 12h ago

CM15 0UJ

Mountnessing • Residential Catchment

Sales (24m)
2
Median Price (3Y)
£467,000
CM15 Price Trend (5Y)
+1.3%/yr

Sales (24m)

2

Median Price (3Y)

£467,000

CM15 Price Trend (5Y)

+1.3%/yr

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CM15 0UJ, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

221 MW

Filtered total

Storage capacity

209 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CM15 0UJ is Battery at 209 MW (48.6% of capacity), compared with 3.9% nationally. Total mapped capacity within 10 miles is 430 MW, versus 105 GW nationally (0.4%).

Nearby power sites

Power sites near CM15 0UJ, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Crouch Solar Farm
Brentwood · Essex · Eastern · England
Solar
Operational
49.9 MW
4.42 mi
Crouch Solar Farm
Brentwood · Essex · Eastern · England
Battery
Operational
49.9 MW
4.42 mi
Outwood
East of England · England
Solar
Operational
4.97 MW
4.51 mi
Ongar Landfill Scheme 2
Epping Forest · Essex · Eastern · England
Gas
Operational
1.80 MW
5.06 mi
Ford Research And Engineering Centre, Dunton - Solar Farm
Basildon · Essex · Eastern · England
Solar
Operational
5.20 MW
5.41 mi
Fairwinds
East of England · England
Solar
Operational
12.2 MW
6.30 mi
Cranham
London · England
Solar
Operational
3.00 MW
6.96 mi
Clay Tye Farm Phase 1 - Storage Facility
Havering · London · London · England
Battery
Operational
49.5 MW
7.34 mi
Nevendon Battery Storage Extension
Basildon · Essex · Eastern · England
Battery
Operational
10.0 MW
7.38 mi
Roxwell Landfill Scheme
Chelmsford · Essex · Eastern · England
Gas
Operational
1.30 MW
8.03 mi
Hill Farm Solar Park & Battery Storage
North Somerset · Leicestershire · East Midlands · England
Solar
Operational
41.8 MW
8.06 mi
Ockendon Landfill Solar Farm
Thurrock · Essex · Eastern · England
Solar
Operational
38.0 MW
8.80 mi
Ockendon Area III
Thurrock · Essex · Eastern · England
Gas
Operational
8.50 MW
8.90 mi
Phoenix House, Christopher Martin Road - Solar Array
North East Lincolnshire · Humberside · Yorkshire and Humber · England
Solar
Operational
49.9 MW
9.58 mi
Ockendon 'B' Landfill Scheme
Thurrock · Essex · Eastern · England
Gas
Operational
4.50 MW
9.68 mi
Southend Arterial Road - Battery Energy Storage
Basildon · Essex · Eastern · England
Battery
Operational
100.0 MW
9.98 mi