Active SectorUpdated 12h ago

DA10 1EA

Residential Catchment

Sales (24M)
5
Median Price
£515,000
DA10 3 year price trend
-33.9%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of DA10 1EA, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

1.2 GW

Filtered total

Storage capacity

200 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of DA10 1EA is Gas at 837 MW (61.0% of capacity), compared with 30.1% nationally. Total mapped capacity within 10 miles is 1.4 GW, versus 105 GW nationally (1.3%).

Nearby power sites

Power sites near DA10 1EA, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Tilbury Docks
Thurrock · Essex · Eastern · England
Wind
Operational
12.0 MW
1.97 mi
Tilbury Green Power
Thurrock · Essex · Eastern · England
Biomass
Operational
43.0 MW
2.49 mi
Thurrock Flexible Generation Plant
The Planning Inspectorate - National Infrastructure · Essex · Eastern · England
Battery
Operational
150 MW
3.57 mi
Coryton Energy Company Ltd
South East · England
Gas
Operational
800 MW
4.50 mi
Medebridge Road - Solar Farm
Thurrock · Essex · Eastern · England
Solar
Operational
49.9 MW
5.33 mi
Barvills Solar Farm
Thurrock · Essex · Eastern · England
Solar
Operational
11.6 MW
5.50 mi
Ockendon 'B' Landfill Scheme
Thurrock · Essex · Eastern · England
Gas
Operational
4.50 MW
5.51 mi
Sandy Lane Landfill Scheme
Thurrock · Essex · Eastern · England
Gas
Operational
2.30 MW
5.58 mi
Aveley
Thurrock · Essex · Eastern · England
Gas
Operational
1.20 MW
5.83 mi
Ockendon Area III
Thurrock · Essex · Eastern · England
Gas
Operational
8.50 MW
6.26 mi
Rainham Landfill Scheme, Phase I
Havering · London · London · England
Gas
Operational
17.0 MW
6.32 mi
Ockendon Landfill Solar Farm
Thurrock · Essex · Eastern · England
Solar
Operational
38.0 MW
6.36 mi
Mucking Gas 3 Landfill Scheme
Thurrock · Essex · Eastern · England
Gas
Operational
3.90 MW
6.42 mi
Clay Tye Farm Phase 1 - Storage Facility
Havering · London · London · England
Battery
Operational
49.5 MW
8.14 mi
Dagenham
London · England
Wind
Operational
5.90 MW
8.30 mi
Riverside - Energy from Waste
London · England
Other
Operational
80.0 MW
8.59 mi
Riverside Resource Recovery Facility (RRRF)
Bexley · London · London · England
Waste / EfW
Operational
72.0 MW
8.59 mi
Crossness Sewage Works
Bexley · London · London · England
Other
Operational
5.70 MW
8.60 mi
Cranham
London · England
Solar
Operational
3.00 MW
8.78 mi
Crossness
London · England
Solar
Operational
1.50 MW
8.99 mi
Fairwinds
East of England · England
Solar
Operational
12.2 MW
9.60 mi