Sales (24M)
5Active SectorUpdated 12h ago
GU10 4PR
Wrecclesham, Farnham • Residential Catchment
Median Price2Y
£310,000GU10 3 year price trend
-22.3%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of GU10 4PR, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
29.7 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of GU10 4PR is Solar at 26.1 MW (87.9% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 29.7 MW, versus 105 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near GU10 4PR, ordered by straight-line distance from the mapped centre.