Sales (24M)
1Active SectorUpdated 12h ago
GU3 2JW
Normandy, Wanborough • Residential Catchment
Median Price5Y
£650,000GU3 3 year price trend
+124.7%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of GU3 2JW, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
17.1 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of GU3 2JW is Solar at 12.0 MW (70.1% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 17.1 MW, versus 105 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near GU3 2JW, ordered by straight-line distance from the mapped centre.