Sales (24M)
3Active SectorUpdated 12h ago
GU52 6AR
Fleet, Church Crookham • Residential Catchment
Median Price3Y
£600,000GU52 3 year price trend
-17.6%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of GU52 6AR, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
32.5 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of GU52 6AR is Solar at 20.9 MW (64.3% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 32.5 MW, versus 105 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near GU52 6AR, ordered by straight-line distance from the mapped centre.