Sales (24M)
19Active SectorUpdated 12h ago
LN4 3FJ
Metheringham • Residential Catchment
Median Price
£207,500LN4 3 year price trend
+30.4%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of LN4 3FJ, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
124 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of LN4 3FJ is Solar at 99.5 MW (80.0% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 124 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near LN4 3FJ, ordered by straight-line distance from the mapped centre.