Capacity
20.0 MW
Mapped total
Barking and Dagenham · London · London · England
Capacity
20.0 MW
Mapped total
Status
Pipeline
Current state
Energy source
Waste / EfW
Mapped fuel group
Connect Waste (Chequers Lane) is an pipeline waste / efw site in Barking and Dagenham · London · London · England with 20.0 MW of mapped capacity operated by Riverside Energy / Enzygo.