Power siteWaste / EfW asset

SELCHP ERF

Lewisham · London · London · England

Mapped capacity
35.0 MW
Status
Operational
Energy source
Waste / EfW

Capacity

35.0 MW

Mapped total

Status

Operational

Current state

Energy source

Waste / EfW

Mapped fuel group

Power Source: Waste / EfW

SELCHP ERF is an operational waste / efw site in Lewisham · London · London · England with 35.0 MW of mapped capacity operated by Veolia (SELCHP).

Postcode[object Object]
CountyLondon
RegionLondon
CountryEngland

Site facts

Status
Operational
Energy source
Waste / EfW
Mapped capacity
35.0 MW
Operator
Veolia (SELCHP)
Commissioned
1993
Address
Landmann Way, New Cross, Lewisham