Capacity
55.0 MW
Mapped total
The Planning Inspectorate - National Infrastructure · London · London · England
Capacity
55.0 MW
Mapped total
Status
Operational
Current state
Energy source
Waste / EfW
Mapped fuel group
Edmonton EcoPark EfW is an operational waste / efw site in The Planning Inspectorate - National Infrastructure · London · London · England with 55.0 MW of mapped capacity operated by Londonwaste.